Connecting Waterpeople

Brown and Caldwell to design pioneering water treatment upgrades in the Rockies

  • Brown and Caldwell to design pioneering water treatment upgrades in the Rockies
  • Once in-a-generation project to enable region’s economic growth.

About the entity

Brown and Caldwell
Brown and Caldwell, Inc. provides environmental engineering, consulting, and construction services serving municipal, private, and federal organizations in the United States.

Themes

Leading environmental engineering and construction firm Brown and Caldwell has been approved by the City of Brighton, Colorado to design improvements and expansions to the City’s drinking water treatment plants (WTPs).

Serving more than 41,000 citizens over a 27-square-mile area, the City owns and operates two WTPs; the Reverse Osmosis (RO) WTP and the Greensand WTP. As Colorado’s population continues to soar (seventh fastest-growing state per U.S. Census Bureau), so does the need for a reliable supply of safe, quality drinking water.

“To meet rising local demand and continue to provide customers with excellent service and system reliability, the City is embarking on a once-in-a-generation project to improve and expand our drinking water treatment system.” - City of Brighton Assistant Director for Utilities Brad Dallam

As prime consultant, Brown and Caldwell is leading a multidisciplinary team to conceptualize, pilot, and design a biological denitrification treatment system, softening process, and facility expansions. These improvements will fulfill Colorado Department of Public Health and Environment compliance date requirements for RO brine discharge and accommodate Brighton’s future treatment and capacity needs while meeting water quality goals. Integrating the design into the operating plants without interrupting services is key to the project’s success. The Brown and Caldwell team includes construction manager at-risk Garney Construction, and public outreach and engagement specialists GBSM.

“The team commends Brighton’s visionary approach, and we look forward to partnering with the City to support future growth and development by delivering a project that is efficient, cost-effective, and transparent,” said Brown and Caldwell Rocky Mountain Area Leader Joe Casias.

Subscribe to our newsletter

The data provided will be treated by iAgua Conocimiento, SL for the purpose of sending emails with updated information and occasionally on products and / or services of interest. For this we need you to check the following box to grant your consent. Remember that at any time you can exercise your rights of access, rectification and elimination of this data. You can consult all the additional and detailed information about Data Protection.

Featured news