Autodesk Water
Connecting Waterpeople
Autodesk Water Webinar Series - April 30th, 10h (UTC+1)

DEWA completes 54.23% of the water pipeline extension project at various locations in Dubai

  • DEWA completes 54.23% of the water pipeline extension project at various locations in Dubai
    Credit: DEWA

About the entity

Dubai Electricity and Water Authority (DEWA)
DEWA uses the latest technologies in water production, transmission, distribution, as well as control of water networks. This has contributed to several successes and achievements, making it one of the best utilities in the world.

Themes

Dubai Electricity and Water Authority (DEWA) has completed 54.23% of the extension of several key water transmission pipelines in Dubai with a cost of about AED 60 million spanning over 22 kilometres with a diameter of 1200mm. The project location runs from Al Quoz Industrial Fourth to Al Thanyah Fifth, alongside Al Khail Road in Dubai. As per the approved plan, the project aims to increase water flow, and enhance the efficiency and reliability of water networks to meet the growing demand in these areas.

HE Saeed Mohammed Al Tayer, MD & CEO of DEWA, said that the project also includes remote monitoring and control, which enables control of key water networks effectively round the clock. This is through automated valves operated from the control centre to reduce interruptions and water network losses.

“We adopt the latest technologies in the production, transmission, and distribution as well as control of water and electricity networks. We apply the highest global standards in our projects to raise operational and production efficiency. DEWA continues to implement vital projects, especially infrastructure projects to achieve the vision of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE, and Ruler of Dubai, to enhance sustainable and comprehensive development in Dubai. DEWA adopts an ambitious strategy to advance its water services. This achieves the happiness and welfare of Dubai residents. We have made significant achievements in developing the water network and raising water flow to meet the current and future needs of customers. This is according to the highest availability, reliability, and efficiency standards. This also meets growing demand and increases water reserves,” added Al Tayer.

Subscribe to our newsletter

Topics of interest

The data provided will be treated by iAgua Conocimiento, SL for the purpose of sending emails with updated information and occasionally on products and / or services of interest. For this we need you to check the following box to grant your consent. Remember that at any time you can exercise your rights of access, rectification and elimination of this data. You can consult all the additional and detailed information about Data Protection.

Featured news